Notice: Undefined offset: 1 in /var/www/tmr/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/utils/class-amp-image-dimension-extractor.php on line 244
Georgia Power cuts ribbon on new Moody battery energy storage facility paired with solar - The Malaysian Reserve
Categories: PR Newswire

Georgia Power cuts ribbon on new Moody battery energy storage facility paired with solar

Newest Lowndes County facility adds 49.5 MW of flexible energy storage to grid

ATLANTA, July 27, 2026 /PRNewswire/ — Georgia Power leaders joined state and local elected officials, as well as community leaders, recently to celebrate the completion of one of the company’s first battery energy storage systems (BESS) connected to solar. The Moody Battery Facility, located just outside of Valdosta, Ga., is capable of 49.5 megawatts (MW) of battery storage, which can be deployed back to the grid over a four-hour period. This flexible energy storage system matches the output of the nearby Moody solar facility and adds resiliency to the state’s power grid.

Georgia Public Service Commission (PSC) Chairman Jason Shaw and Lowndes County Manager Paige Dukes joined members of the Lowndes County Board of Commissioners, the Valdosta City Council, and other community partners, alongside Georgia Power leaders to cut the ribbon on the project, underscoring the strong partnerships that brought this project to life. The event spotlighted not only the importance of the project but also the lasting economic impact and benefits it will bring to Lowndes County.

“The successful completion of the Moody Battery Energy Storage System, ahead of schedule, is great news for our customers and for reliable energy in our state,” said Rick Anderson, senior vice president and senior production officer for Georgia Power. “This project not only enhances grid resiliency but highlights our commitment to adding cost-effective resources to our diverse generation mix through programs reviewed and approved with the Georgia PSC. We appreciate the hard work of Crowder Engineering, and the other companies involved in this project, as well as the community that has supported this new energy source in Lowndes County.”

At this battery and solar co-located facility, battery energy storage helps capture renewable resources produced during periods when the demand for electricity is lower and stores it for use when the demand is higher, such as on cold winter mornings. These projects help to address the state’s growing power needs approved by the Georgia PSC through the Integrated Resource Plan (IRP) process in a cost-effective and strategic manner.

Georgia Power Adding BESS Statewide 
The Moody BESS facility was approved with three other BESS projects across the state, and Georgia Power is nearing completion of those projects – totaling 715 MW – Bibb, Cherokee, and Floyd counties, projects, which were previously approved in the 2023 IRP Update.

The Georgia PSC also approved the construction of nine additional BESS facilities strategically placed on eight sites throughout the state, adding more than 3,000 MW of additional planned storage.  The sites were strategically selected based on deployment capabilities, including the opportunity to locate additional resources at existing company plant sites, existing company-owned land, and proximity to substations or current company facilities. New BESS facilities include locations at Plants Bowen, Hammond, McIntosh, Wansley and Yates as well as stand-alone locations in Hall and McDuffie counties.

To support the increasing demand for renewable energy, the company has also been approved for two new state-of-the-art solar systems paired with battery storage for a combined capacity of 350 MW. These projects are designed to maximize high solar irradiance while minimizing land disturbance. New solar + BESS projects include locations in Laurens and Dougherty counties.

About Georgia Power
Georgia Power is the largest electric subsidiary of Southern Company (NYSE: SO), America’s premier energy company. Value, Reliability, Customer Service and Stewardship are the cornerstones of the company’s promise to 2.8 million customers in all but four of Georgia’s 159 counties. Committed to delivering clean, safe, reliable and affordable energy, Georgia Power maintains a diverse, innovative generation mix that includes nuclear, coal and natural gas, as well as renewables such as solar, hydroelectric and wind. Georgia Power offers rates below the national average, focuses on delivering world-class service to its customers every day and the company is recognized by J.D. Power as an industry leader in customer satisfaction. For more information, visit www.GeorgiaPower.com and connect with the company on Facebook (Facebook.com/GeorgiaPower), X (X.com/GeorgiaPower) and Instagram (Instagram.com/ga_power).

View original content to download multimedia:https://www.prnewswire.com/news-releases/georgia-power-cuts-ribbon-on-new-moody-battery-energy-storage-facility-paired-with-solar-302835688.html

SOURCE Georgia Power

Share
Published by

    Notice: Trying to get property of non-object in /var/www/tmr/wp-content/plugins/nextgen-gallery/products/photocrati_nextgen/modules/third_party_compat/module.third_party_compat.php on line 473

    Notice: Trying to get property of non-object in /var/www/tmr/wp-content/plugins/nextgen-gallery/products/photocrati_nextgen/modules/third_party_compat/module.third_party_compat.php on line 473

Recent Posts

Behind the Stream: How CHZZK’s Top Streamers Brought the Final Home from New York

CUPERTINO, Calif., July 28, 2026 /PRNewswire/ -- When Handongsuk went live from the stands of the…

14 mins ago

Pentair plc Securities Fraud Investigation – Robbins LLP is Investigating Investor Losses in PNR Due to Possible Violations of Securities Laws

SAN DIEGO, July 27, 2026 /PRNewswire/ -- Shareholder rights law firm Robbins LLP is investigating Pentair…

21 mins ago

XCMG XCR90 Named ‘Rough Terrain Crane of the Year’ at 2026 CMME Awards

DUBAI, UAE, July 28, 2026 /PRNewswire/ -- XCMG's XCR90 rough-terrain crane has won the 'Rough…

29 mins ago

The costly winter pet mistakes Australians are making

MELBOURNE, Australia, July 28, 2026 /PRNewswire/ -- As cost-of-living pressures bite, Petstock is warning pet…

31 mins ago

Akeso IO2.0 + ADC2.0 Strategy Makes Another Advancement: First Patient Dosed in Phase Ib/II Study of HER3 ADC (AK138D1) Combined with Ivonescimab in Lung Cancer

HONG KONG, July 27, 2026 /PRNewswire/ -- Akeso, Inc. (9926.HK) ("Akeso" or the "Company") today…

33 mins ago

WIX Investors Have Opportunity to Lead Wix.com Ltd. Securities Fraud Lawsuit

NEW YORK, July 27, 2026 /PRNewswire/ --  Why: Rosen Law Firm, a global investor rights…

34 mins ago